Preliminary list of EU co-funded projects of AB LTG Infra

No.

Projects (responsible body: AB LTG Infra)

Project duration (start and finish date)

Total:

CEF projects:

1.

Bridging the missing links of the Rail Baltic/Rail Baltica EU gauge railway on line Polish and Lithuanian state border - Kaunas and preparation for the development of the EU gauge railway line Kaunas - Lithuanian and Latvian state border:

2017-2022

1.1.

Preparation of spatial planning documentation for straightening of section PL/LT state border – Kaunas

2019-2022

1.2.

Reconstruction of railway line „Jiesia – Rokai" by installing a 1435 mm wide gauge along the existing line

2016-2018

1.3.

Reconstruction of railway line „Kaunas - Palemonas" by installing a 1435 mm wide gauge along the existing line

2018-2021

1.4.  Land acquisition for the construction of 1435 mm railway gauge Lithuanian and Latvian state border - Kaunas 2017-2020

1.5.

Publicity measures

2018-2021

2.

Development of a 1435 mm standard gauge railway line in the Rail Baltic/Rail Baltica (RB) corridor through Estonia, Latvia and Lithuania (Part I, II, III):

2017-2024

2.1.

Study of archaeological and cultural heritage objects (Kaunas – Lithuanian and Latvian state border)

2019-2021

2.2.

Preparation of technical documentation for construction of 1435 mm wide gauge in section Kaunas – Lithuanian and Latvian state border

2019-2021

2.3.

Construction of 1435 mm wide gauge double track in section Palemonas-Kalnėnai

2021-2022

2.4.

Construction of 1435 mm wide gauge double track railway bed in section  Kaunas (Palemonas) – Panevėžys – Lithuanian and Latvian state border

2021-2022

2.5.

Publicity measures

2019-2022

2.6.

Preparation of technical documentation of Infrastructure Maintenance Depot (feasibility study, EIA, territorial planning documents, technical project)

2018-2023

2.7.

Construction of 1435 mm wide gauge double track in section „Kaunas – Lithuanian Latvian state border" (Stage III, 7.5 km railway line (57.9 - 65.4 km), construction of necessary engineering structures, construction of Neris bridge, access roads)

2018-2024

Cohesion fund projects:

3.

Electrification of  Kena – N. Vilnia section

2014-2018

4.

Construction of the second rail track on the line Telsiai-Lieplauke

2014-2019

5.

Construction of the second track of IXB Corridor Vilnius Bypass Pusynas- Paneriai

2016-2020

6.

Vilnius railway junction electrification

2019-2023

7.

Electrification of Kaišiadorys - Klaipėda (Draugystės st.) section

8.

Construction of second rail track on the line Livintai-Gaižiūnai

2019-2023

European regional development fund projects:

9.

Implementation of noise-reducing measures (I stage)

2018-2021

10.

Implementation of noise-reducing measures (II stage)

2019-2021

11.

Modernization and installation of railway safety equipment (level crossing signaling and safety systems) in Valčiūnai railway station (21+848 km)

2019-2020

12.

Elimination of single-level intersections 

2020-2023

13.

Adaptation of the Lyduvėnai railway bridge for visiting

2019-2021

 

 

Updated on 2020-10-06